01
Sourcing & block selection
We work directly with quarries and partner factories across Egypt, Morocco, Turkey and India rather than through intermediaries. Blocks are inspected on site, measured and photographed before allocation, so you are approving a specific block rather than a material name.
02
Processing
Sawing, calibration, finishing and cut-to-size at factory. Slabs are bundled in block sequence so vein continuity survives to installation — the detail most often lost when an order passes through several hands.
03
Quality control
Dimensional checks against your drawings, finish consistency across the lot, and inspection for cracks and repairs before packing. Findings are reported with photographs, including the ones you would rather not receive.
04
Export packing
Timber crates and A-frame bundles specified for sea freight, with strapping and corner protection. Most damage claims trace back to packing, not to the stone, so this is not the place to economise.
05
Freight & booking
Container booking, haulage to port, loading supervision and loading photographs before the container is sealed. FOB, CFR and CIF terms — you choose where our responsibility ends.
06
Documentation
Commercial invoice, packing list, certificate of origin and bill of lading, prepared to match the container exactly and issued together — sent ahead of arrival so clearance is not waiting on paperwork.